The extruder is heated to 200-220 degrees for 1.5-2 hours, depending on the grade of the material. The four and five areas of the machine head are the backup areas. After the temperature reaches the temperature, after the host mold and the molding machine have found a balance, the frame level of the machine tool is To make sure it is accurate, place the level on the mold to level it. After leveling, be sure to tighten the 12 screws on the left and right sides of the mold. If it is not leveled, the material will not come out and the machine head will rub against the mold. There are up, down, left and right adjustment screws on the molding machine.

When leveling, you must ensure that it is most accurate to push out a little material after preheating and then find the balance.

Adjust the deflection of the outer wall, and then use a circle of large screws on the heating belt on the machine head. Which side of the outer wall is thicker, which side is tighter, and which side is looser; adjust the deflection of the inner wall, and then there are 4 small screws on the die, which side Which side is thinner? The inner wall and outer wall are opposite.


1 (2)

1 (4)



How to adjust Fresh air corrugated pipe production line
Previous:No more content
Next:No more content

Recommended products